Equipment MAIN ENGINE 1
Properties
Equipment table: | MACHINERY |
Type: | MACHINERY |
Description: | Gas turbine, water jet |
Compartment: | RERAFT |
Center of gravity: | X = 28.21 m, Y = -2.00 m, Z = 3.60 m |
X length: | 7.00 m |
Y length: | 3.00 m |
Z length: | 2.00 m |
Volume: | 42.0 m³ |
Mass: | 30.000 t |
Parent systems: | Eng1 Main engine 1 |
Redundancy groups: |
Location in the vessel:
Damage
The probability that this piece of equipment gets damaged is 3.03 %.
It's damaged in the following cases:
# | Name | Probability | Cause | Severity | Warhead | Detonation compartment |
---|---|---|---|---|---|---|
30 | 155MMSHELL-HGST0P | 1.01 % | fragments | repairable | 155MMSHELL | HGST0-P |
36 | 155MMSHELL-ROFF1 | 1.01 % | fragments, pressure | repairable | 155MMSHELL | ROFF1 |
37 | 155MMSHELL-ROMESS | 1.01 % | fragments | repairable | 155MMSHELL | ROMESS |